Skip to content

Capabilities

The package municipal review actually reads.

Structural calculations, shop drawings, ordinance review, and permit submissions — researched before design is approved, not after opening dates are locked.

Engineered sign drawing with structural notes

Engineered elevation

Title block

Owner
Engineering with program coordination for jurisdictional filings.
Timing
Ordinance research happens before design lock. Permit applications follow client approval of the engineered package.

Transmittal

  1. Approved design intent and site survey.

  2. Municipal and landlord requirements for the location.

  3. Wind, soil, and existing-foundation information where available.

Field plates

Engineered sign drawing with structural notes

Engineered elevation

Photography pending

Ordinance extract

Shop-file Q&A

Do you pull permits in every city?+

We assemble the package and coordinate the filing. Some jurisdictions require a local applicant of record — we tell you that before the date is promised.

When does ordinance research happen?+

Before design lock. Digital displays, illumination, and ground signs are often different code sections. We read them before we draw.

What is in a typical permit package?+

Engineered drawings, structural calculations, site plan notes, and whatever the municipality or landlord lists as required. Not a rendering deck.

Related products

Related products

Pylons

Illuminated identity pylons and LED price changers — engineered for wind, height limits, and a highway approach.

Related products

Monuments

Ground monuments engineered for site conditions and local sign ordinances.

Related products

Digital displays

Outdoor menu boards and kiosks, indoor concourse screens, LED totems, and displays engineered into pylons — permitted and installed as one program.

Read the case study

Irving — Saint John, NB

Highway pylon — identity and LED price, sized for wind and the municipal height limit.

Program brief

Plan the rollout before the details become delays.

Send your markets, location count, sign families, and target dates. We will identify the permitting, engineering, production, and installation decisions that shape the program.

  1. 01

    We review your brief and confirm the scope.

  2. 02

    We identify the permitting, engineering, production, and installation path.

  3. 03

    A program lead follows up with next steps, typically within one business day.

Intake

Program brief

Montreal plant

Contact

Contact

01
Program scope

Program scope

02

Typical reply: one business day from Montreal. No quote calculator.

Program plan

Need a permit-ready package for a network?

Tell us markets, location count, and dates. We come back with engineering, ordinances, and install as one plan — typically in one business day.

Request a program plan
Request a Quote